A SHARED PROCESS

Good places begin with good questions.

Every project has its own pace, possibilities, and constraints.

Here is a first introduction to working together.

You do not need a complete brief to begin.

Let us talk

Flow

Architectural Process — New Build

Indicative process · Scope, duration, and fees are confirmed individually.

START
  1. Consultation & Site Survey

    Duration — to be confirmed

    • Understand the brief and budget
    • Review the site and available records
    • Define scope and priorities

    ৳ — to be confirmed

  2. Trial Design Proposal

    Duration — to be confirmed

    • Explore an initial spatial direction
    • Discuss feasibility and alternatives
    • Agree the next design stage

    ৳ — to be confirmed

  3. Schematic Design

    Duration — to be confirmed

    • Develop plans and massing
    • Study light, movement, and landscape
    • Review the preliminary direction

    ৳ — to be confirmed

  4. Design Development & Details

    Duration — to be confirmed

    • Coordinate structure and services
    • Develop materials and detailed drawings
    • Review specifications and scope

    ৳ — to be confirmed

  5. Approvals & Cost Coordination

    Duration — to be confirmed

    • Coordinate RAJUK or relevant local authority submissions
    • Review estimates with project partners
    • Clarify procurement and construction scope

    ৳ — to be confirmed

  6. Supervision & Handover

    Duration — to be confirmed

    • Scheduled design-related site reviews
    • Coordinate design clarifications
    • Review completion and handover

    ৳ — to be confirmed

Flow

Architectural Process — Renovation

Indicative process · Scope, duration, and fees are confirmed individually.

START
  1. Consultation & Existing Survey

    Duration — to be confirmed

    • Document the existing condition
    • Discuss use, priorities, and budget
    • Identify specialist investigations

    ৳ — to be confirmed

  2. Trial Proposal

    Duration — to be confirmed

    • Test the potential of the existing space
    • Consider what to retain and renew
    • Review the initial direction

    ৳ — to be confirmed

  3. Schematic Design

    Duration — to be confirmed

    • Develop layout options
    • Explore light and material choices
    • Agree a preferred arrangement

    ৳ — to be confirmed

  4. Detailed Design

    Duration — to be confirmed

    • Prepare coordinated details
    • Specify finishes and fittings
    • Review required specialist inputs

    ৳ — to be confirmed

  5. Permissions & Cost Review

    Duration — to be confirmed

    • Identify applicable permissions
    • Coordinate contractor estimates
    • Agree work stages and access

    ৳ — to be confirmed

  6. Site Review & Handover

    Duration — to be confirmed

    • Review work at agreed milestones
    • Respond to design queries
    • Document completion items

    ৳ — to be confirmed

Start a conversation